2019-20 Unit Plan
Facilities, Planning and Management

Mission Statement

The purpose of Facilities Planning and Management is to create and maintain a safe, positive and appealing environment that supports student and staff success. Our mission is to increase the quality of services provided and establish metrics to verify the level achieved.

The Facilities Planning and Management (FPM) department of the Butte-Glenn Community College District is responsible for the construction, maintenance and operation of the physical plant of the District. Divisions include Custodial, Maintenance, Grounds, Printing, Shipping and Receiving, Transportation, Bond Management Program, and the technical and clerical staff to support these functions.

The vision of an organization can be subdivided into three parts: Core Values, Purpose, and Mission. The Core Values are the basic beliefs that define us as individuals and thus as an organization. These do not change over time. Purpose is the guiding star that defines the direction the organization will always move toward. The Mission is the immediate challenge to be conquered while moving towards fulfilling the Purpose.

Program Description

The FPM department consists of eight units: Custodial Services, Building Maintenance, Grounds Maintenance, Printing Services, Shipping & Receiving, Mail Services & Asset Management, Student Transportation, Staff Motor Pool,  Bond Management Program, and Facilities Support Services. There are approximately 70 permanent employees in the department.


Accountability for Previously Funded Items


Accountability Item 1

Dredge STP Pond #2


Amount: 206500.00
Used For Intended Purpose: Yes
Benefit

Fund used to dredge STP Pond #2. Drudging reduced odor and algae, and increased the depth and width of the pond as overtime it becomes shallower due to sediment, trash and other debris build up at the bottom.



Accountability Item 2

VFD Surge Protectors


Amount: 39590.00
Used For Intended Purpose: Yes
Benefit

VFP surge protectors will protect District equipment during voltage inconsistencies.



Accountability Item 3

Replace 1st Floor Chico Center Bullpen Flooring to eliminate trip hazards


Amount: 21400.00
Used For Intended Purpose: Yes
Benefit

Eliminate trip hazard.



Accountability Item 4

Boiler/Chiller Repairs Campus Wide


Amount: 64200.00
Used For Intended Purpose: Yes
Benefit

Due to the elimination of the type of refrigerant used, we needed to replace these units, saving in energy and cost.



Accountability Item 5

Replace backup HVAC for Chico Center IDF (8)


Amount: 94400.00
Used For Intended Purpose: Yes
Benefit

Due to the elimination of the type of refrigerant used, we needed to replace these units, saving in energy and cost.



Accountability Item 6

Replace (7) package units for AHPS IDF Rooms


Amount: 94400.00
Used For Intended Purpose: Yes
Benefit

Due to the elimination of the type of refrigerant used, we needed to replace these units, saving in energy and cost.



Accountability Item 7

Waterless Urinals Change Out in SAS, Arts, SC, CC


Amount: 64200.00
Used For Intended Purpose: Yes
Benefit

Changing out waterless urinal with water urinals will reduced odor and bacteria. This is for safety and maintenance reason.



Accountability Item 8

Repair doors for BE


Amount: 35400.00
Used For Intended Purpose: Yes
Benefit

The doors exceeded their life expectancy. They were the original doors installed when the building was built in the 70s.



Accountability Item 9

Replace 7 doors at Gym that are failing


Amount: 76700.00
Used For Intended Purpose: Yes
Benefit

The doors exceeded their life expectancy. They were the original doors installed when the building was built in the 70s.

 



Accountability Item 10

Repair AHPS Roof


Amount: 187250.00
Used For Intended Purpose: Yes
Benefit

The roof was repaired due to failed roofing system and leaks.

 



Accountability Item 11

Seal exterior Concrete at water tank - Per 2016 Inspection


Amount: 60990.00
Used For Intended Purpose: Yes
Benefit

To prevent containmentation of our water system, the exterior concrete needed to be sealed.



Accountability Item 12

Crack repair and overlay to Skid Pad apron and EVOC Track


Amount: 91314.00
Used For Intended Purpose: Yes
Benefit

This will make it safer for instruction when using the area and extend the life of the track.



Accountability Item 13

Playfield Restroom Replacement


Amount: 206500.00
Used For Intended Purpose: Yes
Benefit

Replace playfield restroom due to water damage.



Accountability Item 14

Increase in Fuel and Fuel Tax


Amount: 58000.00
Used For Intended Purpose: Yes
Benefit

Due to low enrollment, student fee revenue has decreased but the requirement to support student transportation has not changed. However, there has been an increase in fuel cost and fuel tax.  Funding the fuel budget will continue the Transportation operation at the level at it needs to be. 



Accountability Item 15

Waste Water Treatment


Amount: 12412.00
Used For Intended Purpose: Yes
Benefit

The fund covers additional required testing and inspections on waste water.



Accountability Item 16

Add amplifier speakers to LRC, FPM and Campus Center


Amount: 23600.00
Used For Intended Purpose: Yes
Benefit

This is for safety reason.  Adding amplifier speakers to the LRC, FPM, and Campus Center buildings will notify occupants in or near the building of a lockdown.



Accountability Item 17

Arts quad landscape furniture


Amount: 20000.00
Used For Intended Purpose: Yes
Benefit

The quad lawn is used by students. Adding furniture to the area will provide an outdoor space for students.



Student Learning/Administrative Unit Outcomes (Optional)


        

Standards/Goals for Student Achievement (Instruction Departments) (Optional)


        

Standards/Goals for Student Achievement (All Other Departments) (Optional)


        

Strategic Direction (Optional)


        

Program Review (Optional)

The following goals from the previous strategic plan and program review and the current status:

• Establish and manage a facilities renewal program. Ongoing.
• Identify safety hazards and develop projects to address unsafe conditions. Ongoing.
• Assist instructional and student service departments with development of their projects. Ongoing.
• Ensure that all District facilities, property and vehicles are in compliance with relevant regulations. Ongoing.
• Track and analyze the District’s utility usage and costs. Ongoing.
• Maintain the Bond Management Program. Ongoing.
• Evaluate job class to ensure a match with District needs and requirements. Ongoing.
• Evaluate 2016 Accessibility Survey and create a corrective maintenance plan. Ongoing.

 


Department Goals


        

Future Development Strategies

Strategy 1 - Facilities Renewal Program

Establish and manage a facilities renewal program.


Initiatives
  • Modeling Sustainability
  • Supporting Student, Faculty and Staff Success

Supporting Rationale

The buildings represent the most valuable physical asset of the District with a current replacement value of approximately $355 million. In addition the utility infrastructure, landscape and hardscape are valuable assets of the District. All of these assets have a predictable rate of deterioration and therefore, the need for systematic renewal of these assets to provide for the future usability for District functions.


Supporting Rationale Alignment
Supports Previous Program Review Recommendations: Yes
Supports Changes from Student Learning Outcomes Assessment: No
Supports Meeting Standards and Goals for Student Achievement: No
Improving Student Achievement: No
Addressing Strategies Identified by the Department Learning Outcomes Reports: No
Addressing Outstanding Program Review Recommendations: No
Supporting the College's Strategic Direction and Priorities: No

Strategy 2 - Safety

Identify safety hazards and develop projects to address unsafe conditions.


Initiatives
  • Supporting Student, Faculty and Staff Success
  • Maximizing Resources to Support Student Learning

Supporting Rationale

Some facility deteriorations create unsafe conditions and need to be addressed.


Supporting Rationale Alignment
Supports Previous Program Review Recommendations: Yes
Supports Changes from Student Learning Outcomes Assessment: No
Supports Meeting Standards and Goals for Student Achievement: No
Improving Student Achievement: No
Addressing Strategies Identified by the Department Learning Outcomes Reports: No
Addressing Outstanding Program Review Recommendations: No
Supporting the College's Strategic Direction and Priorities: No

Strategy 3 - Analyze Program Needs

Meet with and discuss facility-related programatic needs for instructional and student services departments.


Initiatives
  • Modeling Sustainability
  • Enhancing a Culture of Completion and Goal Achievement
  • Supporting Student, Faculty and Staff Success
  • Using Data-Informed Processes for Continuous Improvement
  • Maximizing Resources to Support Student Learning
  • Enhancing a Culture of Equity and Inclusiveness

Supporting Rationale

Adaptive use of facility can assist instruction and delivery of student services.   FPM can provide the expertise to assist departments with their augmentation requests.


Supporting Rationale Alignment
Supports Previous Program Review Recommendations: Yes
Supports Changes from Student Learning Outcomes Assessment: No
Supports Meeting Standards and Goals for Student Achievement: No
Improving Student Achievement: No
Addressing Strategies Identified by the Department Learning Outcomes Reports: No
Addressing Outstanding Program Review Recommendations: No
Supporting the College's Strategic Direction and Priorities: No

Strategy 4 - Regulations

Ensure that all District's facility, property and vehicles are in compliance with relevant regulations.


Initiatives
  • Maximizing Resources to Support Student Learning

Supporting Rationale

To reduce the District's exposure to liability and potiental regulatory actions.


Supporting Rationale Alignment
Supports Previous Program Review Recommendations: Yes
Supports Changes from Student Learning Outcomes Assessment: No
Supports Meeting Standards and Goals for Student Achievement: No
Improving Student Achievement: No
Addressing Strategies Identified by the Department Learning Outcomes Reports: No
Addressing Outstanding Program Review Recommendations: No
Supporting the College's Strategic Direction and Priorities: No

Strategy 5 - Utility Usage

Track and analyze District utility usage and costs.


Initiatives
  • Modeling Sustainability
  • Using Data-Informed Processes for Continuous Improvement

Supporting Rationale

Analyzing the District's utility usage will assist with budgeting for future utility costs. 


Supporting Rationale Alignment
Supports Previous Program Review Recommendations: Yes
Supports Changes from Student Learning Outcomes Assessment: No
Supports Meeting Standards and Goals for Student Achievement: No
Improving Student Achievement: No
Addressing Strategies Identified by the Department Learning Outcomes Reports: No
Addressing Outstanding Program Review Recommendations: No
Supporting the College's Strategic Direction and Priorities: No

Strategy 6 - Bond Management Program

Maintain the Bond Management Program and increase staffing level or reclassify staff to match the department needs to support the Bond Program.


Initiatives
  • Enhancing a Culture of Completion and Goal Achievement
  • Supporting Student, Faculty and Staff Success

Supporting Rationale

Additional Program Managers are needed to support the Bond Program.


Supporting Rationale Alignment
Supports Previous Program Review Recommendations: No
Supports Changes from Student Learning Outcomes Assessment: No
Supports Meeting Standards and Goals for Student Achievement: No
Improving Student Achievement: No
Addressing Strategies Identified by the Department Learning Outcomes Reports: Yes
Addressing Outstanding Program Review Recommendations: No
Supporting the College's Strategic Direction and Priorities: Yes

Strategy 7 - Accessibility Survey

Evaluate 2016 Accessibility Survey and create a corrective maintenance plan.


Supporting Rationale

Correcting the deficiencies identified in the survey will make the campus more ADA accessible.


Supporting Rationale Alignment
Supports Previous Program Review Recommendations: No
Supports Changes from Student Learning Outcomes Assessment: No
Supports Meeting Standards and Goals for Student Achievement: No
Improving Student Achievement: No
Addressing Strategies Identified by the Department Learning Outcomes Reports: No
Addressing Outstanding Program Review Recommendations: No
Supporting the College's Strategic Direction and Priorities: No

Requested Non-Financial Resources

Need assistance from Human Resources to reclassify Office Coordinator position to original Supervisor of Technical Services position.

Need assistance from Human Resources to reorganize the Supervisor of Maintenance and Grounds position.

Need assistance from Human Resources to reinstate and hire Grounds Supervisor position and eliminate the lead position.

 

 

Current Financial Resources

None

Augmentation Requests

Original Priority Program, Unit, Area Resource Type Account Number Object Code One Time Augment Ongoing Augment
Description Supporting Rationale Potential Alternative Funding Sources Prioritization Criteria
1 Facilities Plannning and Management Personnel $0.00 $119,834.00
Reorganize FPM Based on the Bond and capital construction program, Facilities is managing a program twice as large as the District general fund in addition to its normal maintenance and operations functions. This request is to 1) reorganize Facilities Support Services and to reclassify the Office Coordinator to a supervisor; 2) reorganize the Supervisor of Building Maintenance and Grounds Maintenance to the Supervisor of Maintenance and Construction; and 3) reinstate and hire the Supervisor of Grounds Maintenance and eliminate the Grounds Lead duties. Due to the Bond Program and the additional workload these positions are critical with the passage of the bond. It would eliminate the need to fill the Assistant Director position. The Supervisor of Building Maintenance and Grounds Maintenance does not have sufficient oversight of the Grounds Maintenance Department. There is a need for direct supervision of the Grounds Maintenance Department, which cannot be performed at the lead level. This reorganization will reinstate and hire the Supervisor of Grounds Maintenance and eliminate the lead duties in Grounds Department. Funds to support this will come from the Assistant Director position.
  • Maintaining ongoing operations at current levels (excludes grants)
  • Fostering a Culture of Inclusiveness
  • Addressing Program Review Recommendations
2 Facilities Planning and Management Operating Expenses $0.00 $81,217.00
Increase in Natural Gas and Electricity Cost Main Campus - Due to the increased square footage of the three portables, Welding & Manufacturing Building, Kinesiology & Athletic Performance Center, and the addition of a Science Lab and due to the 15% increase costs in natural gas and electricity prices due to our solar systems being changed to a new Time of Use rate we will need an augmentation for utilities to support the main campus for the 19-20 fiscal year. � 11.000.210.1.657000.5510 - $28,800 � 11.000.210.1.657000.55520 - $32,417 Skyway Center � Due to the increased size of the Auto Diesel Lab and the 15% increase in natural gas and electricity prices for the 2019-2020 fiscal year the District will need an augmentation for utilities to support the Skyway Center program for the 19-20 fiscal year � � 11.000.210.3.657000.55510 � Natural Gas - $6,800 � 11.000.210.3.657000.55510 � Electricity - $2,200 Cosmetology � Now that program is in operation and true consumption has been determined and due to the 15% increase in natural gas and electricity prices the District will need an augmentation for utilities to support the Cosmetology program for the 19-20 fiscal year. Original estimate for electricity was $20K and the program is estimated to be $24K. Original estimate for natural gas was $5K and the program is estimated to be $14,400. � 11.000.210.8.300700.55510 � Natural Gas - $7,400.00 � 11.000.210.8.300700.55510 � Electricity - $3,600.00
  • Maintaining ongoing operations at current levels (excludes grants)
  • Meeting Standards and Goals for Student Achievement
  • Improving Processes: a. Data and Reporting; b. Internal Communications
3 Facilities Planning & Management Operating Expenses $0.00 $1,205.00
Increase in Water Cost by 15% at Skyway Center and Chico Center Increase in Water Cost 15% at Skyway Center and Chico Center
  • Addressing Health/Life/Safety issues
  • Maintaining ongoing operations at current levels (excludes grants)
4 Facilities Planning and Management Operating Expenses $80,000.00 $6,000.00
Fire Prevention Back-up generator transfer switch for FPM, Well 3, Sewer Treatment Plant ($80K) and larger fire break by Salt Creek crew ($6K).
  • Addressing Health/Life/Safety issues
  • Maintaining ongoing operations at current levels (excludes grants)
5 Facilities Planning and Management Operating Expenses 110002101651000 $0.00 $500.00
Increased in Air Quality Permit Cost The annual Butte County Air Quality permit will increase by $500. This is due to additional boilers added to the campus for Welding & Manufacturing Building and Kinesiology & Athletic Performance Center.
  • Maintaining ongoing operations at current levels (excludes grants)
  • Addressing Health/Life/Safety issues
6 Facilities Planning and Management Operating Expenses 110002101655000 $0.00 $7,620.00
Increased Cost for Weed Abatement at the Storm Water Detention Pond at CHC Increased cost to weed abatement at the storm water detention pond at CHC due to Butte County Vector Control verbal warning prior to a fine that this area must be maintained.
  • Maintaining ongoing operations at current levels (excludes grants)
  • Addressing Health/Life/Safety issues
7 Facilities Planning & Management Facilities $431,922.00 $0.00
Chiller Replacement - Allied Health Building Chillers are failing and need replaced. They were installed in 1998
  • Addressing Health/Life/Safety issues
  • Maintaining ongoing operations at current levels (excludes grants)
8 Facilities Planning and Management Facilities $64,419.00 $0.00
Replace MLR Package Units (3) Units are original and 44 years old. They are failing and need replaced.
  • Addressing Health/Life/Safety issues
  • Maintaining ongoing operations at current levels (excludes grants)
9 Facilities Planning and Management Facilities $41,300.00 $0.00
HVAC Package Unit Repairs Various Buildings Several of the original buildings have package units that are failing and need replaced.
  • Addressing Health/Life/Safety issues
  • Maintaining ongoing operations at current levels (excludes grants)
10 Facilities Planning and Management Facilities $68,480.00 $0.00
Boiler/Chiller Repair and Replacement The annual boiler inspection showed failures in Library, Campus Center, Arts, MLR and WLR that need replaced.
  • Addressing Health/Life/Safety issues
  • Maintaining ongoing operations at current levels (excludes grants)
11 Facilities Planning and Management Facilities $164,303.00 $0.00
Repair electrical switchgear - Parking Lot 1 The switchgear in this location supports a large portion of the campus and has failed and needs to be replaced.
  • Addressing Health/Life/Safety issues
  • Maintaining ongoing operations at current levels (excludes grants)
12 Facilities Planning and Management Facilities $88,500.00 $0.00
Install Water Diversion Meter State Water Resource Board requires meters on all waterline that divert water to assist with drought requirements . Ag program needs to divert water to their outdoor labs and need the meter installed prior to the diversion being allowed.
  • Addressing Health/Life/Safety issues
  • Maintaining ongoing operations at current levels (excludes grants)
13 Facilities Planning and Management Facilities $30,000.00 $0.00
Campus Red Curb and Directional Arrow Painting The campus parking lots red curbs and directional arrows have faded causing safety issues with traffic. Lines need to be repainted.
  • Maintaining ongoing operations at current levels (excludes grants)
  • Addressing Health/Life/Safety issues
14 Facilities Planning and Management Facilities $18,154.00 $0.00
Replace Entry Flooring AHPS South Flooring at entry of AHPS South is failing and has trip hazards. Needs to be replaced.
  • Addressing Health/Life/Safety issues
  • Maintaining ongoing operations at current levels (excludes grants)
15 Facilities Planning and Management Facilities $11,800.00 $0.00
Replace Entry Flooring at Chico Center Student Lounge Flooring at the Student Lounge is failing and causing trip hazards. Needs replaced.
  • Addressing Health/Life/Safety issues
  • Maintaining ongoing operations at current levels (excludes grants)
16 Facilities Planning and Management Facilities $41,075.00 $0.00
Campus walkway lighting repairs and replacement Quad Area and Athletic Area Safety issue due to age of lights they are failing and need to be replaced. We will replace with LED lights.
  • Addressing Health/Life/Safety issues
  • Maintaining ongoing operations at current levels (excludes grants)
17 Facilities Planning and Management Facilities $55,696.00 $0.00
Domestic Water Heater Replacement The domestic water heaters in AHPS, CDC, LRC, Life Science, and PSTC need to be replaced. They have reached their expected life cycle and have been noted by the inspector a failing and needing replaced.
  • Addressing Health/Life/Safety issues
  • Maintaining ongoing operations at current levels (excludes grants)
18 Facilities Planning and Management Facilities $53,607.00 $0.00
Repair of underground electrical conduit and bunkers (6) Current underground electrical bunkers fill with water during rainy weather. The water floods into the attached buildings causing water damage. Bunkers need to be sealed.
  • Addressing Health/Life/Safety issues
  • Maintaining ongoing operations at current levels (excludes grants)
19 Facilities Planning and Management Facilities $89,276.00 $0.00
Replace Flooring Campus Center First Floor Flooring on 1st floor of Campus Center is warping due to water intrusion. Floor needs replaced. Causing trip hazards.
  • Addressing Health/Life/Safety issues
  • Maintaining ongoing operations at current levels (excludes grants)
20 Facilities Planning and Management Operating Expenses $191,455.00 $0.00
Replace Flooring in Gym Labs Main Gym Labs floor is original and has been diagnosed with termite damage. It needs replaced.
  • Addressing Health/Life/Safety issues
  • Maintaining ongoing operations at current levels (excludes grants)
21 Facilities Planning and Management Facilities $82,600.00 $0.00
Replace CDC Fencing Fencing for Child Development Center does not meet current state standards and needs to be replaced.
  • Addressing Health/Life/Safety issues
  • Maintaining ongoing operations at current levels (excludes grants)
22 Facilities Planning and Management Facilities $167,163.00 $0.00
Rebuild Well House 1 (Lower Well) Rebuild Well House 1 (Lower Well)
  • Addressing Health/Life/Safety issues
  • Maintaining ongoing operations at current levels (excludes grants)
23 Facilities Planning and Management Facilities 56220 $55,000.00 $0.00
Lactation Room at CHC The law requires employers to provide a place for nursing that is not a bathroom. It must be completely private so that no one can see inside the space and no one is able to enter the space while it is being used. The current practice of lending office space to students and employees is not compliant. Facilities has agreed that the new private space will include: chair, small table, waste basket, at least one electrical outlet, a door that can be locked from the inside, and sink. Sink installation would require adding a waterline and waste line and some HVAC as there is none currently in the room. FPM says this will be an easier convert than other suggested rooms in CHC.